(NA) Attica: Construction of its Water System Improvements project. The Project will be constructed in two (2) contract divisions which is defined and outlined as follows: Division A – Water Supply, Treatment and Storage Facilities: Scope of work to include the demolition of and reconstruction of Well #1 building, renovation of Well #2 building, replacement of existing chlorination equipment, installation of a new standby generator for the water treatment facility and wells, new SCADA integration, demolition of the roof on the existing inground reservoir and replacement with an aluminum dome cover, replacement of two (2) existing booster pumps, as well as site piping, site restoration and all other ancillary work required for a complete system. Division B – Distribution System: Scope of work to include the installation of approximately 1,360 lineal feet of 6” water main, installation of approximately 18 new water meters, pits, setters and curb stops, installation of approximately 16 insertion approximately 16 insertion valves, replacement of approximately 24 hydrant assemblies, as well as all pavement, sidewalk, drive and lawn restoration required.
*Bid specifications not available for past bids.
Our nation-wide team looks for bids in every agency to ensure the most comprehensive coverage available. We are the lowest cost bid service provider nationwide, but we don't sacrifice quality for price.