(NA) Brownstown: Utility Improvements Project, Contract A – WWTP & Lift Station Improvements. The Work at the Vallonia Road Lift Station shall include the installation of three (3) new submersible pumps and guide rails; five (5) plug valves; three (3) check valves; one (1) 10” magnetic flow meter; one (1) 48” diameter meter vault; one (1) jib crane furnished with an electrical hoist and concrete base; one (1) emergency generator and concrete pad; one (1) control panel; one (1) electrical junction box; the replacement of three (3) air release valves on the existing 10” force main; site fencing, and asphalt drive modifications. Additional work shall include the demolition of the existing jib crane and concrete base, the demolition of the existing emergency generator and concrete pad, and the relocation of the existing utility pole; coatings; electrical; instrumentation and controls; excavation; dewatering; regrading; site work; clean up, and all other work and appurtenances necessary for a complete installation. The Work at the Bob Thomas Lift Station shall include the installation of one (1) 72” diameter wet well; one (1) 60” diameter valve vault; two (2) new submersible pumps and guide rails; four (4) plug valves; two (2) check valves; one (1) 4” magnetic flow meter; one (1) 48” diameter meter vault; one (1) emergency generator and concrete pad; one (1) control panel; the replacement of one (1) air release valve on the existing 4” force main; site fencing, and crushed stone drive modifications. Additional work shall include the demolition of the existing wet well and valve vault; yard piping; coatings; electrical; instrumentation and controls; excavation; dewatering; regrading; site work; clean up, and all other work and appurtenances necessary for a complete installation. The Work at the Brownstown Wastewater Treatment Plant shall include the replacement of one (1) rotary drum screen; one (1) grit classifier; two (2) secondary clarifier mechanisms and equipment, and one (1) ultraviolet light disinfection system. Additional work shall include the construction of a new Plant potable water line, including approximately 175 LF of jack-and-bore installation with a 12” steel casing in compliance with CSX Transportation requirements; replacement of the Blower Building roof with metal roofing; replacement of the Administration Building roof with metal roofing; repainting of the Blower Building wooden fascia; installation of metal snowguards on the UV Building, Belt Press Building, Maintenance Garage, Headworks Structure, and Blower Building; replacement of gutters and downspouts on the Belt Press Building, UV Building, and Maintenance Garage; demolition of the existing equipment at the various locations; coatings; electrical; instrumentation and controls; excavation; dewatering; regrading; site work; clean up, and all other appurtenances necessary to complete installation of work as specified and as shown in the Contract Documents. For required coating activities, refer to Specification Section 09900. Work shall be constructed under a Lump Sum Contract.
*Bid specifications not available for past bids.
Our nation-wide team looks for bids in every agency to ensure the most comprehensive coverage available. We are the lowest cost bid service provider nationwide, but we don't sacrifice quality for price.