(419004) Contra Costa Water District: w/ *ADDENDA 1-3* Phase 2 Los Vaqueros Reservoir Expansion Project Transfer Pipeline Inspection. The Work includes: Dewatering and Inspection of approximately 20,500 linear feet of 72" diameter cement mortar lined and coated welded steel pipe; provision of temporary piping to provide water to ponds; provision of a temporary domestic and fire water system to serve the District's Los Vaqueros Watershed Office at the location shown on the project drawings and as more specifically described in Paragraphs 01500-2.2, A through E, and Paragraph 01500-12.0; and provision of trucked water to the Los Vaqueros Watershed Office and to cattle troughs within a 5-mile radius of the Los Vaqueros Watershed Office. **DUE DATE EXTENDED TO 6/16/22
*Bid specifications not available for past bids.
Our nation-wide team looks for bids in every agency to ensure the most comprehensive coverage available. We are the lowest cost bid service provider nationwide, but we don't sacrifice quality for price.