(NA) Brazosport Independent School District : Removal, Transportation, and Disposal of Asbestos-Containing Building Materials and The Demolition of Various Buildings Located at The Fleming Elementary School Campus. This project includes the removal of approximately 10,500 square feet of flooring materials; 2,000 linear feet of Black duct mastic; 1,100 linear feet of pipe insulation; 1,000 linear feet of Interior gray windowpane glazing; 550 square feet of interior cement panels; 5,600 square feet of black moisture barrier; 6,000 square feet of exterior gray corrugated cement panels; and black moisture barrier. The Asbestos Scope of work Procedures will be available at the Mandatory Pre-Bid and Walkthrough Meeting.
*Bid specifications not available for past bids.
Our nation-wide team looks for bids in every agency to ensure the most comprehensive coverage available. We are the lowest cost bid service provider nationwide, but we don't sacrifice quality for price.