( 22-2 ) FREEHOLD : JACKSON MILLS ROAD WATER TREATMENT PLANT REPAIR AND REDEVELOPMENT OF WELL NO. 14 CONTRACT. The work includes furnishing all labor and equipment for the mobilization and demobilization; removal and disposal of the left-right coupling; for inspection of the existing removed pump and testing of the wiring from the control panel to the well; for mechanical and chemical redevelopment of Well No. 14; for removal and disposal of the existing Well No. 14 internals and column piping; replacement of the existing local electrical disconnect, wiring and submersible wiring to the well pump; reinstallation of the repaired well pump, new column pipe, well internals; disinfection, conditioning, testing, and flushing of Well No. 14; start-up of Well No. 14; and site cleanup.
*Bid specifications not available for past bids.
Our nation-wide team looks for bids in every agency to ensure the most comprehensive coverage available. We are the lowest cost bid service provider nationwide, but we don't sacrifice quality for price.