(CW-21-01 ) West Jordan: ZONE 6 HIGHWAY JUNCTION RESERVOIR 2 PROJECT The Work includes the construction of a new 3 MG AWWA D110, Type 1, prestressed concrete reservoir; reservoir inlet, outlet, underdrain, drain, overflow, and washdown piping; connections to existing yard piping; temporary piping, electrical and SCADA connections during construction; landscaping, restoration and irrigation; electrical, instrumentation and controls; testing, disinfection, commissioning and startup. Work includes mechanical improvements to the existing Outlet Valve Vault; excavation, backfill, earthwork; asphalt access roads and asphalt restoration associated with construction of new facilities; and all other work required to complete this project as defined in the drawings and specifications