(169645) Lakeland : Removal of Process Water Ponds Solids at McIntosh Power Plant. The City of Lakeland is seeking bids from a qualified contractor to remove, dewater, and transport the solids from the McIntosh power plant (MPP) process water ponds to the onsite permitted byproduct storage area (BSA). the following are the work site locations: process ponds (west of e. Lake Parker Drive), temporary drying pond (east of e. lake Parker Drive) and byproduct storage area (BSA) (east of Lake Parker Drive), McIntosh power plant, 3030 east lake Parker Drive., Lakeland, fl.