Folsom: w/ *ADDENDA 1-3* WATER TREATMENT PLANT BACKWASH AND RECYCLED WATER CAPACITY PROJECT. The project is generally described as demolition of three existing submersible decant pumps, installation of three new submersible decant pumps, replacement of piping, influent shear/slide gates, valves, and other appurtenances for the Decant Pump Station, installation of approximately 175 linear feet of 36” welded steel RBW pipe and valves, temporary bypass pumping substituting for the Decant Pump Station and temporary water barrier in the Reclamation Backwash Basin (RBB), miscellaneous civil sitework including AC pavement and concrete replacement associated with the Work, and associated electrical, instrumentation, and controls. **DUE DATE EXTENDED TO 3/25/22