(20-032-SEW-009) Anacortes : *ADDENDA 1 & 2* WWTP Outfall Relocation – Upland Phase. This project consists of construction of the upland portion of a new wastewater treatment plant outfall conveying treated effluent from the City’s WWTP to Guemes Channel. Significant project elements include: Construction of a 48-inch diameter WWTP outfall from the WWTP to the end of U Ave; blasting and excavating rock for several hundred feet of the pipeline alignment at depths up to approximately 30 feet deep; connection to the “WWTP Outfall Relocation - Marine Phase” outfall; associated manhole structures; selective demolition of existing piping and structures including asbestos concrete pipe; roadway restoration; testing and assistance during commissioning of new facilities; connection of the new 48-inch pipeline to the existing 30-inch WWTP outfall; surface restoration of the pipeline alignment.
*Bid specifications not available for past bids.
Our nation-wide team looks for bids in every agency to ensure the most comprehensive coverage available. We are the lowest cost bid service provider nationwide, but we don't sacrifice quality for price.