(2022-02) Bowling Green Municipal Utilities: BGMU WATER RECOVERY FACILITY ODOR CONTROL CONSTRUCTION The work to be performed (Work) consists of the construction of the new odor control systems and ventilation at the headworks building. The project includes (but not limited to) the following: 1. Decommissioning, demolition, and removal of the existing odor control system. 2. Providing temporary odor control during construction if necessary. 3. Installing a new two-stage odor control system furnished by Owner. 4. Decommissioning, demolition, and removal of the existing makeup air (MAU-1).. 5. Installing two (2) new make-up air units for headworks building. 6. Modifying the electrical and instrumentation/control systems as necessary. 7. Complete additional associated work as identified in the bid documents.