(5845 ) Coventry: w/*Addendum 1* Landfill Gas Venting System at Miller Richardson Park Athletic Field. The Contractor shall be responsible for but not limited to: maintaining overall site conditions, maintaining permanent access roads, installing and maintaining erosion control measures, disruption of the existing landfill cap, installation of the Landfill Gas Venting System, proper management of excavated materials, including wastes, and restoration of the site for use as general purpose athletic fields.
*Bid specifications not available for past bids.
Our nation-wide team looks for bids in every agency to ensure the most comprehensive coverage available. We are the lowest cost bid service provider nationwide, but we don't sacrifice quality for price.